• About
    • Our Team
    • Location
    • Industry Case Studies
    • Mission & Values
    • Corporate Responsibility
    • Vendor Management
    • History
    • Contact
  • Industries
    • Agribusiness
    • Food & Beverage
    • Metals & Steel
    • Mining, Aggregate, & Concrete
    • Oil & Gas
    • Paper
    • Power Generation & Energy
    • Water & Wastewater
    • Wind Services
  • Products
    • Type
    • Manufacturers
    • Asset Management Program
  • Generators
  • Remanufacture
    • Electrical Repairs
    • Mechanical Repairs
    • Machining
  • Field Services
    • All Services
    • Installation and Commissioning
    • Overhead Crane & Hoist Services
    • Wireless Equipment Condition Monitoring IoT
    • Predictive & Preventative
      • Vibration Analysis
      • On-Site Electrical Testing
      • Large AC and DC Motor PM and Repair
      • Gear Reducers
      • Precision Laser Alignment
  • Asset Management
    • Asset Management Program
    • Transport & Logistics
  • Careers
  • Login

Decatur Industrial Electric

Contact Us

Service & Quotes: 217-428-6621

You are here: Home / Uncategorized / What a Nuisance!

What a Nuisance!

Most circuits will have instantaneous, short term, and long term over load protection. If the circuit includes instantaneous trip devices which react in less than a single AC cycle such as magnetic-only circuit protectors, this could be the cause of the nuisance tripping your plant operators have commented about.

During a motor start-up there are two components that make up the starting current, the instantaneous peak in-rush and the locked rotor current. The instantaneous peak in-rush is the momentary transient that occurs immediately (within half an AC cycle) after the contacts close. Locked rotor current follows the instantaneous current through acceleration to steady state.

The M-Series EMAX performing a six channel 3-phase In-Rush/Start-Up test using the latest MCEGold® software displays both current and voltage transients to assist you in determining the possible cause of these random trips. After completion of an In-Rush test, all three phases of RMS current will be displayed as well as the instantaneous peak current. Comparing these values to the trip settings of the circuit’s over current protection allows you to identify the source of the trip as motor or circuit protection driven. For guidance on increasing the instantaneous trip level to avoid nuisance tripping refer to Section 430 of the latest National Electrical Code.

To see a variety of case studies involving electric motors visit the PdMA YouTube Channel at:

https://www.youtube.com/channel/UC-cUONWaudkKReNwC0PPXMQ

Filed Under: Uncategorized

Archives

  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • February 2025
  • January 2025
  • November 2024
  • August 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • January 2024
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • June 2023
  • May 2023
  • April 2023
  • February 2023
  • January 2023
  • December 2022
  • November 2022
  • October 2022
  • August 2022
  • July 2022
  • June 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • January 2022
  • December 2021
  • November 2021
  • October 2021
  • September 2021
  • August 2021
  • July 2021
  • June 2021
  • April 2021
  • March 2021
  • February 2021
  • January 2021
  • December 2020
  • November 2020
  • October 2020
  • September 2020
  • August 2020
  • July 2020
  • June 2020
  • May 2020
  • April 2020
  • March 2020
  • February 2020
  • January 2020
  • December 2019
  • November 2019
  • October 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • April 2019
  • March 2019
  • February 2019
  • January 2019
  • December 2018
  • November 2018
  • October 2018
  • September 2018
  • August 2018
  • July 2018
  • June 2018
  • May 2018
  • April 2018
  • March 2018
  • February 2018
  • January 2018
  • December 2017
  • November 2017
  • October 2017
  • September 2017
  • August 2017
  • July 2017
  • May 2017
  • April 2017
  • March 2017
  • February 2017
  • January 2017
  • December 2016
  • November 2016
  • October 2016
  • September 2016
  • August 2016
  • July 2016
  • June 2016
  • May 2016
  • April 2016
  • March 2016
  • January 2016
  • December 2014
  • November 2014

Copyright © 2025 Decatur Industrial Electric - 217-428-6621